Your unit in the building is designated as an office, has stood empty for months, and as a flat it would let immediately. Now it turns out the owners’ meeting won’t have it, the managing agent is hedging, and no one will tell you plainly who actually decides this. That is exactly what I set out below — step by step, and keeping apart the two hurdles that almost always get muddled.
In short
You have to clear two separate hurdles. Within the community, the deciding factor is the designated purpose set out in the declaration of division: if it has been bindingly agreed, it can as a rule only be changed by an agreement of all the owners — a simple majority vote will not do without an express opening clause. Externally, the change of use requires building consent, which depends on the type of area. And a different use can be permissible even without amending the declaration of division, if, on a generalised assessment, it causes no more disturbance than the use that is allowed.
How I can help
- Reading the declaration of division, the community rules and the layout plan to see whether the designated purpose is actually binding or merely descriptive
- An assessment of whether residential use is already permissible as things stand — without any consent at all
- Drafting an agenda item and the text of a resolution or agreement that can also be entered in the land register
- Protecting deadlines: challenging a rejecting resolution, an action to have a resolution substituted, a claim to have the agreement adjusted
- Defence for the other side: where a unit in your building is being put to a different use without consent
- The building-law side: the change-of-use application, an exception or exemption, and liaising with the building authority
Hurdle one: What exactly does your declaration of division say?
In principle, every owner may deal with their own unit as they see fit, and in particular live in it or let it (section 13(1) WEG). But that “in principle” has a limit: under section 14(1) no. 1 WEG, every owner is obliged to abide by the agreements — and the designated purpose in the declaration of division is typically just such an agreement.
What matters, then, is the precise wording:
- If the label appears only as a caption in the layout plan (“Office 3”), that is often not a binding restriction on use but a description of the position as it stands.
- If, on the other hand, it says the unit “serves as an office” or “may be used for commercial purposes only”, a binding designated purpose is the likely reading.
- Many community rules also contain an opening clause — that is, permission to decide certain questions by a majority specified there. If we find one, it changes the whole route.
The second point to check is often overlooked: even where there is a binding designated purpose, a different use is permissible if, on a generalised assessment, it causes no more disturbance than the use that was agreed. Several things speak in favour of residential use in an office unit — fewer visitors, no delivery vehicles, no external advertising. What may count against you: use around the clock, children’s noise on the stairs, demand for parking spaces, and use of the lift and the bin store. This is a balancing exercise on the facts, not an automatic outcome — but it is the quickest route where it holds, because then you need no one’s consent.
Hurdle two: Whose consent is needed — and which majority is not enough
If the designated purpose is genuinely to be changed, that is a change to an agreement. For that, the following applies:
- The consent of all the owners is required. A simple majority resolution will not carry it. Where the community lacks the competence to resolve on a matter, the resolution is no help even if no one has challenged it.
- For the change to bind the next purchaser as well, it must be entered in the land register as part of the content of the unit ownership (section 10(3) WEG). An agreement in writing alone binds the current owners — and runs out on the first sale. Entry in the land register requires certified signatures; depending on the content, the consent of registered creditors may also be required.
- If individual owners block it, section 10(2) WEG remains: every owner may demand that an agreement be adjusted where, for serious reasons and having regard to all the circumstances, holding to the existing arrangement would be inequitable. The threshold is high — lasting inability to let the commercial unit, together with a clear absence of disadvantage to the others, are the arguments that count here. This action is brought not against the community but against the remaining owners; section 44(2) WEG applies only to actions concerning resolutions.
The conversion itself is a separate matter. Anything that interferes with the common property — a new window opening, the routing of pipes, a balcony, an additional service connection — is a structural alteration. It can be permitted by a simple majority (section 20(1) WEG), and you even have a claim to have it permitted where all the owners whose rights would be affected beyond the unavoidable degree agree (section 20(3) WEG). The limit is drawn by section 20(4) WEG: anything that fundamentally reshapes the development or inequitably disadvantages an owner may not be permitted. Measures that remain entirely within your own unit need no permission, so long as no other owner suffers a disadvantage beyond the unavoidable degree (section 13(2) WEG).
The deadlines on which the matter usually turns
If the meeting rejects the item, there is a negative resolution — and that can be challenged. The deadline is short and is regularly missed: the action to challenge must be brought within one month of the resolution being passed and the grounds filed within two months of it being passed (section 45 WEG). Both periods run from the meeting, not from receipt of the minutes. Anyone who waits for the minutes has often already used up half the time.
Running alongside this is the action to have a resolution substituted: where a necessary resolution is not passed, the court can pass it itself (section 44(1) sentence 2 WEG). Actions concerning resolutions are to be brought against the community of owners (section 44(2) WEG), and the judgment takes effect for and against all owners (section 44(3) WEG). Jurisdiction lies exclusively with the local court (Amtsgericht) in whose district the property is situated — which is why it makes no difference to your representation where you or I happen to be based.
On the other side: if a unit in your building is being put to a different use without consent, you do not lose your right to object straight away. Where the use is continuing, the claim to have it stopped arises afresh on an ongoing basis, so limitation is rarely the end of the matter. But anyone who looks on for years and says nothing risks their claim being forfeited.
Hurdle three: The building authority asks about the local plan
Changing from office to residential is a change of use. The building regulations of the federal states differ, but the core position is this: it requires consent where the new use is subject to different public-law requirements — and here that is almost always the case. What is typically affected are the second means of escape and fire protection, sound insulation between units, the lighting and ceiling height of habitable rooms, parking spaces, and the energy requirements.
In planning terms, everything hangs on the type of area:
- Mixed-use area (Mischgebiet): residential buildings are generally permissible (section 6(2) no. 1 BauNVO) — this is the straightforward case.
- Core area (Kerngebiet): operationally related dwellings are permissible, other dwellings only as provided for by the stipulations of the local plan (section 7(2) nos. 6 and 7 BauNVO) or by way of exception (section 7(3) no. 2 BauNVO).
- Commercial/industrial area (Gewerbegebiet): residential use is provided for only by way of exception, and only for supervisory and on-call staff, business owners and managers, as something allocated and subordinate to the business (section 8(3) no. 1 BauNVO). Ordinary residential use is not provided for there — here the route runs through an exemption.
For that there is currently more room than there used to be. Section 31(2) BauGB allows an exemption where the basic features of the plan are not affected and one of the grounds listed there applies — expressly including the housing needs of the population. Section 31(3) BauGB permits an exemption in favour of housing with the municipality’s consent. And section 246e BauGB contains a time-limited special provision for housing which, with the municipality’s consent, allows deviations until the end of 31 December 2030 and in subsection (1) no. 3 names precisely our case: the change of use of lawfully erected structures for residential purposes. Where a municipal conversion agency is actively driving the conversion of vacant offices into housing, this is the lever it relies on.
What remains important is to keep the two apart: building consent is granted without prejudice to the private rights of third parties. It does not replace the community’s consent — and vice versa.
A typical case
A ground-floor unit, designated as an office in the declaration of division, has stood empty for two years. The owner wants to make two small flats out of it and applies for an agenda item. The meeting rejects it by a narrow majority; noise and parking are given as the reasons. The review reveals three separate fronts. First, the community rules contain no opening clause, so the rejecting resolution has to be challenged within the deadline, otherwise the meeting is, for the time being, done with this item. Second, the planned window opening onto the courtyard is a structural alteration and needs its own resolution. Third, the unit happens to lie in a mixed-use area, which makes the planning side the simplest. What is negotiated in the end is usually what genuinely troubles the neighbours — parking arrangements, who bears the costs, construction times — and the result belongs in an agreement that is entered in the land register.
Common mistakes
- Converting first and asking afterwards. Reversing the work costs more than any review beforehand.
- Taking building consent to be the community’s permission. These are two procedures with two sets of criteria.
- Relying on an oral assurance from the managing agent. The managing agent cannot change the designated purpose.
- Letting the one-month deadline under section 45 WEG slip because you wanted to wait for the minutes first.
- Treating a majority resolution as sufficient where there is no opening clause.
- Recording the agreement in writing only and saving on entry in the land register — until the first unit is sold.
Frequently asked questions
Is a majority resolution of the owners’ meeting enough?
As a rule, not for changing a binding designated purpose. What is needed is an agreement of all the owners, unless the community rules contain an opening clause that assigns precisely this point to a majority. For the conversion work affecting the common property, on the other hand, a majority resolution under section 20(1) WEG is enough.
The declaration of division calls the unit an “office” — may I live there anyway?
Possibly, yes. A different use is permissible if, on a generalised assessment, it causes no more disturbance than the use that was agreed. Residential use often brings fewer visitors than office use, but use at all hours of the day. This is a balancing exercise on the facts — and the first point I check in your papers.
Building consent has been granted — can the community still stop me?
Yes. Building consent decides only on public building law and is granted without prejudice to the private rights of third parties. If the use breaches the designated purpose, the community can demand that it be stopped, even though you built with consent.
Do I have to challenge the rejecting resolution if I am going to go to court anyway?
As a rule, yes. An unchallenged negative resolution will stand in your way later, and the one-month deadline from the passing of the resolution runs regardless of whether you have the minutes yet. The challenge and the action to have a resolution substituted can be combined.
What does this cost, and will legal-expenses insurance pay?
The fee is governed by the RVG and thus by the value of the matter, or alternatively by an agreement; what an initial assessment costs I will tell you in the first consultation, before anything is instructed. Legal-expenses policies cover WEG disputes depending on the tariff, while the building-consent procedure is frequently excluded — I will handle the cover enquiry.
Your next step
Have three documents ready: the declaration of division together with the community rules, the current land-register extract for your unit, and the minutes of the last meeting at which the matter was discussed. From those it is usually possible to say, in the first conversation, whether you need any consent at all, which majority will carry, and which deadline is currently running. You will find more on the neighbouring questions on the overview of property law.
If a rejecting resolution has already been passed, please get in touch promptly — the one-month deadline runs from the meeting. I act nationwide; we hold the conversation by video or telephone. This article gives general information and is no substitute for advice on the individual case.
This article provides general information and is no substitute for legal advice in an individual case. Last updated: 2026-11-23.

Christian Czirnich, Rechtsanwalt (attorney at law), Kirchseeon near Munich
Tell me what you plan for the unit and who is blocking it – I will look into it.